Construction in the North
Find out more

Overview

The northern end of the project includes the Northern Tunnels site, Pearces Corner, Northern Ventilation Facility and M1 Widening works.

Construction is to ensure motorists can access the tunnel from the M1 Pacific Motorway and also Pennant Hills Road.

A fact sheet is available.

Current work

Paving 

We are building the pavement in three main layers; a layer of no fines concrete as the base of the pavement, a sealing layer of asphalt and a final layer of continuously reinforced concrete pavement. Concrete roads are highly durable. 

Most paving is completed at night to avoid concrete trucks causing congestion on Pennant Hills Road. About 12,000 cubic metres of concrete is being used across the project each week, supplied by NorthConnex’s dedicated batching plant.

Concrete paver

Blockwork

The southbound and northbound tunnels are joined by cross passages, which are spaced about every 120 metres. The cross passages house tunnel operations equipment. Work is continuing to build walls, floors and roofing in the cross passages known as blockwork.
Blockwork

Painting 

The tunnel roof is being painted matte black to minimise distractions for motorists. The painters hand-spray the paint onto the tunnel roof in sections, using elevated work platforms.

Matte black ceiling

Permanent above ground facilities

Work is continuing to fit out the Northern Ventilation Facility. This involves building internal walls and doors, installing electrical cabling and equipment, then commissioning the building.

Northern Ventilation Facility

Completed work

We have already finished a lot of work in this section including:

  • In early 2016 shaft excavation was carried out to reach the required tunnel depth
  • During tunnelling 20 roadheaders were used. Roadheaders have a rotating, rock-cutting head on the front, mounted to a boom. When the underground rock is cut, a loading device transfers the rock onto a conveyor belt which runs the spoil onto haulage trucks. Roadheaders travel on bulldozer style tracks and weigh around 100 tonnes
  • Benching involves removing the lower part of the tunnel to achieve the desired final height. Two surface miners were used to complete this work, surface miners have large cutting drums and can cut about 50 centimetres deep as they travel along the tunnel floor. Roadheaders are also used to carry out benching using a large cutting boom on the front of the machine
  • Trenching has been carried out to create space for drainage and electrical infrastructure
  • Work on Pennant Hills Road between the M1 Pacific Motorway and Pacific Highway to provide an additional northbound lane towards Hornsby and an additional turning lane onto the Pacific Highway.

Upcoming work

Reflective panelling

Reflective panelling is being installed along the tunnel alignment. The panels maximise light reflection and generate a feeling of spaciousness for the driver. To install them we build a frame on the tunnel wall and then attach the panels.

Framing for reflective panels

Mechanical and electrical fit out

The Mechanical and Electrical Team is installing lighting, fire deluge systems (high flow fire sprinklers), CCTV cameras, cable trays, jet fans and other tunnel systems. Most equipment is placed in the cross passages and in the tunnel roof.

Lighting – we are installing LED lights every 12 meters inside the tunnel. They are mounted on cable trays, which are installed in the tunnel roof.

Fire deluge systems – about 120 metres of fire deluge system is installed every week. This involves the team installing high flow fire sprinklers into the tunnel.

CCTV Camera installation – we are installing more than 700 CCTV cameras in the tunnel which will be used to monitor conditions inside the tunnel once it opens to traffic. Footage will be viewed from the Motorway Control Centre.

Cable tray installation  we are installing more than 30 kilometres of cable trays inside the tunnel. To do this, we fix prefabricated brackets into their final position and lock them into place in the tunnel roof.

Jet fans – 140 jet fans are being installed in the tunnel. We do this by mounting jet fans to a cradle in the tunnel roof and bolting the fans into place. A safety chain is then fitted on the fan for additional security.

Once equipment is installed, commissioning works must be completed. You can read more about the commissioning process here

Lighting installation
Fit out of jet fans